Each interruption is applied 10 times, and for auxiliary power supplies with a big operating range, the tests are completed at minimum, maximum, and other voltages across this range, to check compliance over the complete range. Therefore, complex type tests simulating the working conditions are completed at the manufacturer's facilities during. Relay testing and commissioning is the process of verifying that the installed protection relay, its settings, its wiring, and its interaction with the wider electrical system all match the approved design and operate as intended. This is not only a relay check. In the substation the settings must then only be transferred by PC (Laptop) from the mass storage to the protection device. To test. This handbook is meant to enable the commissioning personnel to efficiently complete pre-commissioning activities according to SEC Standard and specification before the equipment is brought to service condition. Handbook Contents: GIS and Switchgear: Current Transformer (CT): Voltage Transformer. These tests should be followed to determine if the relay is operating correctly. 0) - 2948492 and the Ergon Energy Protection.
[PDF Version]